Renewal Methods
This chapter presents an overview of different methods that can be used for culvert and storm sewer renewal. For each method, product main characteristics, method description, construction...

Introduction
This chapter serves as an introduction to the book. The application and scope of its recommendations for hybrid coupled wall systems are discussed....

Alternative Hybrid Wall Systems
This chapter discusses alternative hybrid wall systems. Topics include unbonded post-tensioned coupled wall systems; steel coupling beam with fuse; and composite shear plate coupling beam....

Technology Based Hybrid Classes for Multiple Applications
The academic demands on a typical professor mean that his or her time must be used to maximum advantage. There is advising of students, research, teaching, grading, class preparation,...

Innovative Methods Used in the Design and Construction of the New Tacoma Narrows Bridge
On September 25, 2002, Notice-to-Proceed for a Design/Build Agreement was issued by the Washington State Department of Transportation (WSDOT), directing Tacoma Narrows Constructors (TNC)...

Building Code Requirements and Specification for Masonry Structures
Containing Building Code Requirements for Masonry Structures (TMS 402-08/ACI 530-08/ASCE 5-08, Specification for Masonry Structures (TMS 602-08/ACI 530.1-08/ASCE 6-08) and Companion Committees
The Code covers the design and construction of masonry structrures while the Specification is concerned with the minimum construction requirements for masonry in structures. Some of the...

Fundamentals of Risk Assessment
Risk, expressed in terms of potential human sufferings and economic losses, is very real and its significance is particularly important when considering natural hazards. For effective...

Analytical Solutions for Coupled Reactive Transport Equations
Modeling the transport of reactive contaminants is one of the key challenges faced by groundwater engineers worldwide. Specifically, problems involving the transport of sequentially decaying...

Optimal Resource Allocation for the Cleanup of Petroleum Contaminated Sites
Site rehabilitation is conducted in many states using a risk-based corrective action process wherein alternative remedial actions are evaluated and implemented, depending on the level...

Refrigerated Foundations
Refrigeration systems used to cool foundations on frozen ground can be classified as either active or passive, depending on whether external energy is used to power the systems. If pumps,...

Infrastructure Planning Handbook
Planning, Engineering, and Economics
The book covers the concepts, methods, and management skills necessary to plan and maintain infrastructure. Topics include major infrastructure projects in context; master planning; infrastructure...

Numerical Integration
This chapter discusses numerical integration in Microsoft Excel....

Guidelines for the Testing of Seismic Isolation and Energy Dissipating Devices
This report outlines the HITEC Technical Evaluation Plan for seismic isolation and energy dissipating systems. The plan is designed to characterize the fundamental properties and performance...

Natural Attenuation of Hazardous Wastes
Sponsored by the Natural Attenuation Task Committee of the Environmental and Multi-Media Council of the Environmental and Water Resources Institute of ASCE. ...

Zemmouri, Algeria, Mw 6.8 Earthquake of May 31, 2003
Prepared by the Earthquake Investigations Committee of the Technical Council of Lifeline Earthquake Engineering ASCE. This TCLEE Monograph summarizes...

Toronto Takes Off
Travelers using Toronto's Pearson International Airport will soon be passing through a new, state-of-the-art terminal, the centerpiece of a 10-year airport redevelopment project....

High-Impact Innovation
As engineers increasingly embrace the storm-water management approach commonly known as low-impact development (LID), the number of innovative LID projects is growing across the country....

Repairing Pittsburgh's Portal
Engineering the rehabilitation of Pittsburgh's Fort Pitt Bridge and Fort Pitt Tunnel involved an extensive inspection of their condition and a detailed evaluation of alternative...

The Best Alternative
The City of Portland, Oregon, is using a hybrid contracting scheme that combines the scheduling advantages of design/build with the control of a construction manager arrangement to construct...

Independent Research Assessment of Project Management Factors Affecting Department of Energy Project Success
Prepared for the U.S. Department of Energy by the Civil Engineering Research Foundation. This report presents the findings of a research study to improve...

 

 

 

 